UAE project guidance

Plan the information, interfaces and inspections before site work.

These guides cover practical decisions for fit out and technical contracting in Dubai, Abu Dhabi and across the UAE.

Technical drawings and material samples under review

Featured coordination guide

Coordinate service routes with ceilings, partitions and equipment.

MEP coordination should confirm space, access, crossings, builder’s work and commissioning requirements before installation.

Read the MEP coordination guide ↗
01

Office Fit Out Guide

Brief the workplace before drawing it; test circulation and services together; and plan the move as part of the build.

Read ↗
02

Dubai Fit Out Process

Start with the premises rules; prepare information for review; and protect the delivery window.

Read ↗
03

Restaurant Design Guide

Design around the operating model; resolve intensive services early; and specify for cleaning and endurance.

Read ↗
04

Office Renovation Checklist

Survey what will remain; separate reuse from replacement; and sequence around occupation.

Read ↗
05

Choosing Interior Contractors

Compare scope clarity, not only totals; test coordination capability; and confirm the handover route.

Read ↗
06

Authority Approval Process

Identify the reviewing parties; control document dependencies; and track comments to closure.

Read ↗
07

MEP Coordination

Reserve space before installation; coordinate interfaces, not isolated drawings; and commission as a system.

Read ↗
08

Acoustic Design

Define the acoustic problem; protect the whole construction; and verify workmanship and operation.

Read ↗
09

Sustainable Interiors

Reduce before specifying; choose with evidence and context; and carry intent into handover.

Read ↗