UAE project guidance
Plan the information, interfaces and inspections before site work.
These guides cover practical decisions for fit out and technical contracting in Dubai, Abu Dhabi and across the UAE.

Featured coordination guide
Coordinate service routes with ceilings, partitions and equipment.
MEP coordination should confirm space, access, crossings, builder’s work and commissioning requirements before installation.
Read the MEP coordination guide ↗Office Fit Out Guide
Brief the workplace before drawing it; test circulation and services together; and plan the move as part of the build.
Read ↗02Dubai Fit Out Process
Start with the premises rules; prepare information for review; and protect the delivery window.
Read ↗03Restaurant Design Guide
Design around the operating model; resolve intensive services early; and specify for cleaning and endurance.
Read ↗04Office Renovation Checklist
Survey what will remain; separate reuse from replacement; and sequence around occupation.
Read ↗05Choosing Interior Contractors
Compare scope clarity, not only totals; test coordination capability; and confirm the handover route.
Read ↗06Authority Approval Process
Identify the reviewing parties; control document dependencies; and track comments to closure.
Read ↗07MEP Coordination
Reserve space before installation; coordinate interfaces, not isolated drawings; and commission as a system.
Read ↗08Acoustic Design
Define the acoustic problem; protect the whole construction; and verify workmanship and operation.
Read ↗09Sustainable Interiors
Reduce before specifying; choose with evidence and context; and carry intent into handover.
Read ↗