Technical contracting scope · UAE
Interior Design
Space plans, material schedules and construction details prepared around the brief, existing conditions and UAE building requirements.

How interior design moves from survey to handover.
We review premises information, scope limits, access, connected trades and the applicable review route. Drawings, material submissions, procurement, installation checks and handover records are then coordinated against the agreed programme.
- 01
Scope definition
Brief, survey and space planning.
- 02
Project constraints
Existing structure, services and operational needs.
- 03
Technical interfaces
Materials, lighting, MEP and joinery details.
- 04
Quality checks and handover
Coordinated drawings, schedules and finish records.
Prepare the first scope review
